Профессиональное развитие будущих инженеров-строителей средствами иностранного языка: Лексический практикум по английскому языку. Трубникова Н.В. - 43 стр.

UptoLike

Составители: 

43
Site B: air velocity, 0.6 m/s; air temperature, —10 °C
d.b.
Block D
Creative work
Write a technical report on the aspects of the provi-
sion of outdoor air for the ventilation of the following:
1) a commercial building that has offices, retail shops
and a pedestrian atrium;
2) an underground high – security manufacturing and
storage facility for nuclear materials;
3) a large open – plan metal – fabrication factory;
4) a university;
5) an hotel;
6) a sport centre that has swimming, weight training,
aerobics, racquet courts and restaurant facilities.
Chapter 2
Heating
Block A
Key terms and concepts:
absorption heat pumps
building energy management system (BEMS)
ceiling heating
chemistry of combustion
chimney
class of oil
combined heat and power (CHP)
combustion air
computer-based control