of defective parts
The removing of defects Num
ber
Material Price
10 Journals of worn gear Machine for truth 2 p Steel 6
11 Flywheel Take off. Repair. Install.
Examine. Assemble. In-
stall in place. Renew studs
and nuts of attachment of
flywheel valves.
1 p
4 p
Cast iron
Steel
INDICATOR DRIVE
12 Indicator drive Take off. Repair. Install in
place. Test.
8 sets 157
13 Manometer Furnish and install. Take,
adjust and install in place.
1 p
2 p
3 p
100
Two-stage, one cylinder compressor for port diesel dynamo-compressor
Two-stage, one cylinder Dismantle, upon the com-
pletion of repairs install in
place/
1 p 117
HP cylinder block Make and install 1 p Cast iron 189
LP and LP cylinder block Make and install 1 p Cast iron 269
Crank shaft Machine journal and
crankpins
3 p 66
AUXILIARY FIRE TUBE BOILER (OIL, FUEL) HEATING SURFACE 50 m
2
Boiler Take off boiler shell and
insulation. Clean boiler
body inside and outside.
Take off boiler setting,
smoke boxes and exhaust
gas pipes in funnel. Clean
all to bare metal. Paint red.
Lead. Examine. Provide
water pressure test as re-
quired by Lloid's Register
of Shipping. Find out these
defects. Renew combustion
top plate. Take ashore boi-
ler and reinstall to vessel
after completion of repair.
1 p 10,1
Stay and plane tubes Renew stay tubes.
Renew plane tubes
2 p
15 p
307
List of Repairs
V. Answer the questions.
1. What parts of diesel- engine require repairing?
2. How many cylinder blocks are necessary to be renewed?
3. What material should be used to make the parts?
4. What pressure should the manometer be adjusted?
5. What kind of repair should be done to flywheel, crankshaft, boiler?
VI. Sum up the information and order the master of the ship about the repairs re-
quired?
67
№ The name The removing of defects Num Material Price of defective parts ber 10 Journals of worn gear Machine for truth 2p Steel 6 11 Flywheel Take off. Repair. Install. 1p Cast iron Examine. Assemble. In- 4p Steel stall in place. Renew studs and nuts of attachment of flywheel valves. INDICATOR DRIVE 12 Indicator drive Take off. Repair. Install in 8 sets 157 place. Test. 13 Manometer Furnish and install. Take, 1p 100 adjust and install in place. 2p 3p Two-stage, one cylinder compressor for port diesel dynamo-compressor Two-stage, one cylinder Dismantle, upon the com- 1p 117 pletion of repairs install in place/ HP cylinder block Make and install 1p Cast iron 189 LP and LP cylinder block Make and install 1p Cast iron 269 Crank shaft Machine journal and 3p 66 crankpins AUXILIARY FIRE TUBE BOILER (OIL, FUEL) HEATING SURFACE 50 m2 Boiler Take off boiler shell and 1p 10,1 insulation. Clean boiler body inside and outside. Take off boiler setting, smoke boxes and exhaust gas pipes in funnel. Clean all to bare metal. Paint red. Lead. Examine. Provide water pressure test as re- quired by Lloid's Register of Shipping. Find out these defects. Renew combustion top plate. Take ashore boi- ler and reinstall to vessel after completion of repair. Stay and plane tubes Renew stay tubes. 2p 307 Renew plane tubes 15 p List of Repairs V. Answer the questions. 1. What parts of diesel- engine require repairing? 2. How many cylinder blocks are necessary to be renewed? 3. What material should be used to make the parts? 4. What pressure should the manometer be adjusted? 5. What kind of repair should be done to flywheel, crankshaft, boiler? VI. Sum up the information and order the master of the ship about the repairs re- quired? 67
Страницы
- « первая
- ‹ предыдущая
- …
- 65
- 66
- 67
- 68
- 69
- …
- следующая ›
- последняя »